Project Description

  • DESIGN YEAR: 2013
  • YEAR OF PRODUCTION: 2014
  • CLIENT: Green Power
  • TYPE OF INTERVENTION:
    Final design Lighting rugby field
  • BUDGET: __
  • TOTAL SURFACE: ca. 16,000 m2

SPORTS CENTER E. CERESINI
PARMA

The operation relates to the adjustment of the lighting field rugby training inside the Sports Center “E.Ceresini” in Via Moletolo in Parma.
The existing lighting system was constituted by two beacon towers located on a side of the field and equipped with five lamps each. The issues related to that facility were tied unilateral principalmenteall’illuminazione, which created the shadows on the field with disturbances to visual performance of the players, and the low level of illumination.

The project has therefore place as main purpose the achievement of the standards required by the technical enlighten industry regulations. In accordance with UNI-EN 12193: 2008 “of sports lighting installations” and the guidelines issued by CONI for fields with activity level 1 (non-competitive activities) was guaranteed average illumination and uniformity exceeding 75lx respectively and 0.5. This result was achieved by providing the installation of two new lighting towers on the opposite side of the training field. The new units also provide less light dispersion.